Science.-NASA will attempt to launch the Artemis I mission again on Saturday

Madrid, 31 (European press)

This was communicated by NASA through its Twitter profile, where it indicated that the take-off window for the ship that will travel to the Moon will begin at 2:17 pm (local time, 8:17 pm Spanish time).

The space agency reported that the failure that prevented the launch of Artemis I was related to one of the SLS’s four central stage engines. Specifically, engine No. 3 was unable to reach the appropriate temperature required to take off.

Once the error is resolved, Artemis mission manager Mike Sarafin announces that Artemis I continues to work on platform 39B at the Kennedy Space Center, where it will blast off into space on September 3.

The Artemis I mission aims to be the first step, without a crew, to successive missions with the ultimate goal of returning astronauts to the lunar surface and enabling a long-term human presence for decades to come.

NASA said in an August 5 briefing that the primary goals of Artemis 1 are to demonstrate Orion systems in a spaceflight environment, ensuring a safe return, landing, mist, and recovery prior to the first manned flight aboard Artemis 2.

The mission has a duration of four to six weeks, a journey of 2.1 million kilometers, with several orbits of the Earth and the Moon in its journey.

See also  from Yuri Gagarin to the coronavirus vaccine

Myrtle Frost

"Reader. Evil problem solver. Typical analyst. Unapologetic internet ninja."

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top